Electricity Transmission Rates Filing Requirements Review
The Ontario Energy Board (OEB) is seeking stakeholder input on a proposed update to the OEB’s Filing Requirements for Electricity Transmission Applications - Chapter 1 and Chapter 2 (the Filing Requirements).
The Filing Requirements, originally developed in 2016, will be reviewed as part of this engagement to identify any necessary updates.
The purpose of this engagement is to work with stakeholders to review the proposed updates and determine if any others are needed to:
- Account for the passage of time
- Reflect learnings from past transmission revenue requirement proceedings
- Include any further regulatory process efficiencies that have and can be achieved
The review is intended to ensure the Filing Requirements stay relevant and fit for purpose.
The Ontario Energy Board (OEB) is seeking stakeholder input on a proposed update to the OEB’s Filing Requirements for Electricity Transmission Applications - Chapter 1 and Chapter 2 (the Filing Requirements).
The Filing Requirements, originally developed in 2016, will be reviewed as part of this engagement to identify any necessary updates.
The purpose of this engagement is to work with stakeholders to review the proposed updates and determine if any others are needed to:
- Account for the passage of time
- Reflect learnings from past transmission revenue requirement proceedings
- Include any further regulatory process efficiencies that have and can be achieved
The review is intended to ensure the Filing Requirements stay relevant and fit for purpose.
-
OEB Updates Filing Requirements for Electricity Transmitters
The OEB has released updated Filing Requirements for Electricity Transmission Applications (Chapters 1 and 2), effective for 2027 rate applications and beyond. These changes aim to improve regulatory clarity, reduce administrative burden, and reflect evolving sector needs.
The most significant update is the introduction of a new revenue requirement setting option under Custom IR, specifically designed for transmitters with a declining rate base. (All update documents (including track change versions) are available in the Consultation Documents section on the right-hand side of this page.)
Other key updates include:
- Higher materiality thresholds to account for inflation since 2016. These apply to both the provision of evidence and the establishment of deferral and variance accounts, helping to reduce regulatory burden and focus adjudication on material issues.
- Clarifications regarding application filing deadlines to better coordinate the annual transmission rate-setting process.
- Minor technical and structural updates to align the Filing Requirements with other OEB relevant guidance documents.
The updates were shaped by stakeholder feedback from consultations held in mid-2025.
Fourteen organizations, including transmitters and consumer groups, participated in the consultation process. The OEB thanks all stakeholders for their valuable input, which helped shape the updated Filing Requirements and accompanying guidance.
-
About the project
Rate Framework for Single-Asset Transmitters
A key focus of the update is to provide guidance on the revenue requirement framework for the growing number of single-asset transmitters now operating in Ontario. Specifically, it aims to clarify the expectations for Custom Incentive Rate-setting (Custom IR) applications required to support filings under this approach.
Effective Date and Future Developments
The updated Filing Requirements are proposed to apply to transmission rebasing applications for 2027 rates.
These updates reflect current legislative and OEB policy frameworks, as well as general regulatory practices. The OEB also recognizes that the transmission sector is evolving. Accordingly, future changes such as the introduction of a Transmission Selection Framework by the Independent Electricity System Operator may necessitate further revisions.
The OEB intends to review these Filing Requirements every five years to ensure they remain fit for purpose.
-
About the OEB's Filing Requirements for Electricity Transmission Applications
The OEB publishes filing requirements to guide rate-regulated electricity transmitters in preparing transmission applications. This consultation focuses on Chapters 1 and 2 of the OEB’s Filing Requirements for Electricity Transmission Applications.
- Chapter 1 addresses general procedural matters and outlines the OEB’s expectations for parties involved in transmission revenue requirement and leave-to-construct proceedings.
- Chapter 2 provides detailed filing requirements for revenue requirement applications.
Notably, Chapters 1 and 2 have remained unchanged since their initial development in 2016.
Consultation timeline
-
Electricity Transmission Rates Filing Requirements Review
Electricity Transmission Rates Filing Requirements Review has finished this stagePreliminary draft update of Chapters 1 and 2 of the Filing Requirements for Electricity Applications prepared for public/stakeholder consultation.
-
Consultation launch
Electricity Transmission Rates Filing Requirements Review has finished this stageJune 5, 2025: Letter initiating consultation issued along with first-round draft update to stakeholders for review and comment.
-
Stakeholder meeting
Electricity Transmission Rates Filing Requirements Review has finished this stageJune 25, 2025: Stakeholder meeting to provide an overview of changes to the filing requirements
-
Stakeholder feedback
Electricity Transmission Rates Filing Requirements Review has finished this stageJuly 17, 2025 : Post-stakeholder meeting
July 31, 2025: Opportunity for stakeholders to respond to feedback submitted by others, with supplementary comments.
-
Under review
Electricity Transmission Rates Filing Requirements Review has finished this stageEvaluation and review of stakeholder comments now underway. Second-round draft incorporating feedback prepared for review.
-
Updated Electricity Transmission Filing Requirements issued
Electricity Transmission Rates Filing Requirements Review is currently at this stageOctober 30, 2025
Consultation Documents
-
Consultation Launch (June 5, 2025)
-
Updated Deadline for OEB Stakeholder Feedback (June 27 2025)
-
Updated Filing Requirements for Electricity Transmitters (October 30, 2025)
-
OEB Cover Letter-Updated Filing Requirements (October 30 2025)
-
OEB Tx Filing Requirements-Chapter 1 (Updated version-2025-10-30)
-
OEB Tx Filing Requirements-Chapter 2 (Updated version-2025-10-30)
-
Custom IR Guidance for Transmitters with a Declining Rate Base (October 30 2025)
-
OEB Tx Filing Requirements-Chapter 1 (Track change version-2025-10-30)
-
OEB Tx Filing Requirements-Chapter 2 (Track change version-2025-10-30)
-
Key dates
-
June 16 2025
-
June 25 2025
-
July 17 2025
-
July 31 2025
Consultation Case details
We're listening
-
Email Tina.Zhu@oeb.ca -